Planing Program
| # | Section Name | Hole Size | Is Pilot Hole | Depth From | Depth To | Planned Days | Cummulative Plan days | Action |
|---|---|---|---|---|---|---|---|---|
| 1 | ||||||||
| 2 |
| Section Name | Hole Size | Is Pilot Hole | Depth From | Depth To | Planned Days | Cummulative Plan days |
|---|---|---|---|---|---|---|
| Drilling 22" Section |
| # | Section Name | Hole Size | Is Pilot Hole | Depth From | Depth To | Total Mud Volume, bbl | Total cost ($) | Cumulative Total cost ($) | Action |
|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Depth From | Depth To | Mud Type | Mud weight | Plastic Viscosity (PV) | Yield Point (YP) | Water Loss | Pore pressure gradient | Fracture pressure gradient | overbalance, ppg | Mud Volume, bbl | Cost Per volume ($/bbl) | Total cost ($) | Cumulative Total cost ($) | Comments | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Section Name | Hole Size | Is Pilot Hole | Depth From | Depth To | Total Cost | Cuulative Cost | Comments | Action |
|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Hole Size | Depth From | Depth To | Casing Type | Casing OD | Casing weight | Casing grade | Casing ID | Casing Drift ID | Casing length | Collapse pressure | Burst pressure | Tension rating | Cost | Comments | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Section Name | Hole Size | Is Pilot Hole | Total Lead Volume | Total Tail Volume | Total Cost | Cumulative Cost | Action |
|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Hole Size | Casin OD | Lead height | Lead weight | Tail height | Tail weight | Shoe Track Length | Excess, % | Volume | cost | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Section Name | Hole Size | Is Pilot Hole | Depth From | Depth To | Depth To | D/T In | D/T Out | Total Number of Bits | Total Cost of Bit, $ | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Hole Size | Depth From | Depth To | Bit Serial No | Bit Type | Bit company | Planned ROP | Condition while running | Cost | Action |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Section Name | Hole Size | Is Pilot Hole | Depth From | Depth To | D/T In | D/T Out | Total BHA number | Directional Services Cost | Cumulative Directional Services Cost | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Item name | Item Type | OD | ID | weight | top connection | tension rating | BHA Type | Directional drilling company | Directional Services Cost | Action |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | MD (ft) | INC (deg) | AZI (deg) | TVD(ft) | VS (ft) | Closure (ft) | NS (ft) | EW (ft) | Action |
|---|---|---|---|---|---|---|---|---|---|
| 1 |
| # | Starta | Lithology | From Depth, ft. | To Depth, ft. | Reservoir | Action |
|---|---|---|---|---|---|---|
| 1 |
| RTKB | BHCIP | MW (ppg) | BHST | FLUID CONTENT | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| # | FORMATION | FT. | PSIG. | EMW | MW | O/B | DEG.F | OIL | GAS | WATER | H2S,% | CO2, % | Action |
| 1 | |||||||||||||
| # | Item | OEM | Description | Action |
|---|---|---|---|---|
| 1 |
| # | PHASE | LOGS | REMARKS | Action |
|---|---|---|---|---|
| 1 |
| # | Formations | Tops (TVD-RTKB) | Thickness | Core Interval | Core Type | Action |
|---|---|---|---|---|---|---|
| 1 |
| # | Reservoir Name | Test Interval (Ft) | Test Objective | Test type | Action |
|---|---|---|---|---|---|
| 1 |