# From To Duration (hr) Hole Size (in) Depth (ft) Drilling/Flat time Operation Phase Code Sub Class NPT Classification NPT Owner Action
1  
# Section Name Hole Size Is Pilot Hole Depth From Depth To Actual Days Cummulative Actual days Action
1  
2  

Section Name Hole Size Is Pilot Hole Depth From Depth To Actual Days Cummulative Actual days
Drilling 22" Section
# Section Name Hole Size Is Pilot Hole Depth From Depth To Total Mud Volume, bbl Total cost ($) Cumulative Total cost ($) Action
1  

# Depth From Depth To Mud Type Mud weight Plastic Viscosity (PV) Yield Point (YP) Water Loss Pore pressure gradient Fracture pressure gradient overbalance, ppg Mud Volume, bbl Cost Per volume ($/bbl) Total cost ($) Cumulative Total cost ($) Comments Action
1  


Fann Data

# Section Name Hole Size Action
1  
# Section Name Hole Size Is Pilot Hole Depth From Depth To D/T In D/T Out Total BHA number Directional Services Cost Cumulative Directional Services Cost Action
1  

# Item name Item Type OD ID weight top connection tension rating BHA Type Directional drilling company Directional Services Cost Action
1  
# Section Name Hole Size Is Pilot Hole Depth From Depth To Depth To D/T In D/T Out Total Number of Bits Total Cost of Bit, $ Action
1  

# Hole Size Depth From Depth To Bit Serial No Bit Type Bit company Planned ROP Condition while running Cost Action
1  

Today Operations


# Section Name Depth From Depth To TVD test Mud Weight Surface Pressure EMW Action
1  
# Section Name Hole Size Is Pilot Hole Depth From Depth To Total Cost Cuulative Cost Comments Action
1  

# Hole Size Depth From Depth To Casing Type Casing OD Casing weight Casing grade Casing ID Casing Drift ID Casing length Collapse pressure Burst pressure Tension rating Cost Comments Action
1  
# Section Name Hole Size Is Pilot Hole Total Lead Volume Total Tail Volume Total Cost Cumulative Cost Action
1  

# Hole Size Casin OD Lead height Lead weight Tail height Tail weight Shoe Track Length Excess, % Volume cost Action
1  

# 1 2 3 4 5 6
Hole Size
From depth
To depth
Section length
Planned days
Sevices Unit Cost Cost Type
Rig 10000
Directional services
Mud Cost
Mud Services
Bit
Casing
Cement
Fishing
TOTAL
# Material UOM Start Adjusted Received Returned Usage Quantity Left Comments Action
1  
# Pit Name Pit Volume Action
1  
# Make Model Type Stroke (inch) No of cylinders Liner Size (in) Rod OD (in) Pump Type Liner install date Efficiency (%) Action
1  
# MD (ft) INC (deg) AZI (deg) TVD(ft) VS (ft) Closure (ft) NS (ft) EW (ft) Action
1  
# Starta Lithology From Depth, ft. To Depth, ft. Reservoir Action
1  
# Item OEM Btm Flange Size Btm Flange rating Top Flange Size Top Flange rating Description Action
1  
# Hole Size/Phase LOGS REMARKS Action
1  
# Formations Tops (TVD-RTKB) Bottom (TVD-RKB) Thickness Core Type Action
1  
# Reservoir Name Test Interval Top (Ft) Test Interval Bottom (Ft) Test Objective Test type Action
1  
# Company Service No of People Carry over Action
1  

BOP Test

Pressure Test